Manufacture & Testing Of Heel Pool Components

CLIENT: DSRL

CONTRACT VALUE: £1,600,000.00

DSRL awarded Gow’s the contract to manufacture, assemble, offsite test and deliver the Heel Pool pump and its associated components. DSRL had the requirement to remove, as far as reasonably practical, residual alkali metals from the Prototype Fast Reactor (PFR)’s vessel to prepare it for dismantling. Bulk deposits are located in the base of the vessel, named the heel pool.

Gow’s manufactured and installed a solution that met DSRL’S requirements and specifications allowing them to meet a key milestone regarding decommissioning activities onsite.

Scope of Project

Industry Standards

Find Us/Contact

Mavsey, Lybster, Caithness, KW3 6AS

Telephone: +44 (0)1593 721585
Fax: +44 (0)1593 721403
Email: info@gows.co.uk